The equipment is used for automatic installation of PV module junction boxes, supporting multi-model junction box matching and compatible with mainstream module types.High-speed & stable performance with compact layout,equipped with mobile teaching pendant for intuitive and flexible operation.Standardized modular design enables rapid model changeover.

| Applicable edition | L:1650-2520(mm);W:990-1450(mm) |
| Cycle Time | 12s |
| Source | AC 3 phase, 380V/N/PE, 50Hz, 16.5kVA |
| Gas source | 0.4-0.6(MPa);Compressed Air:0.4m³/min |
| Noise | ≤75dB |
| Net Weight | 3500kg |
| Equipment Size (L×W×H) | 5370*2000*2530mm |
| Compatible incoming material specification | Panorama mode: 1.U-shaped panorama 2.O-shaped panorama
1. Requirements for U-shaped coil: a. The distance between the center of the junction box and the end of the cable is less than or equal to 145mm b. The coil is fixed with a C-clamp 2.O-type coil requirements: a. The distance between the center of the junction box and the end of the cable is less than or equal to 145mm b. The distance between the end of the junction box and the center of the coil is not less than 40mm c. The coil is fixed with a zip strap |
| Installation position precision | ±0.5mm |